30 Days Return and Refund

Bought the wrong product?

Rogz Control Long Lead X-LARGE 1.2m



More info.

Make 4 payments of $10.51 over 8 weeks and get it now!

Make your selection
Name Price Quantity
BLACK X-Large
$42.05
BLUE X-Large
$42.05
RED X-Large
$42.05
PINK X-Large
$42.05
Total: $0.00

Rogz Control Lead – Shock Absorbing Bungee​ - X-Large

The Rogz Control Lead is a shock absorbing lead, with ShocLoc Control.

Rogz Control Lead has a bungee portion that absorbs shock. This lead is designed for moderate pullers. The Control Lead absorbs the shock from a quick pull or jerk, minimizing the risk of injury to you or your dog.

Designed to be used with a matching Collar or Harness, this lead is easily attached to any D-Ring.

  • Fixed Lead,
  • Reflective Stitching,
  • Colourful,
  • Shock-Absorbing Comfortable Handle,
  • Shock Absorbing Webbing,
  • ShocLoc Feature for Close Control,
  • SnapLoc Trigger Hook
  • Nickel-Plated Zinc Trigger Hook to Prevent Rusting.

Rogz - The world’s safest pet Gear!

The Safety of us and our pets is the number one priority at Rogz

Rogz Components and materials undergo stringent strength tests all through the product development stages, long before even reach the production floor, ensuring our products are manufactured to the highest quality, strength and safety standards.

The new product development team at Rogz continually strives to improve the strength and functionality of our components.

SKU 3072
Brand Rogz
Unit Of Measure Each

Simply email us at: helpdesk@aussievetproducts.com.au with the following details and we’ll contact you personally to arrange your price match.

  • Name
  • Contact number
  • Your delivery postcode
  • All products you are wanting to order, including the product you want to price match
  • The url or store name of where you have seen the product cheaper

We Also Recommend


You May Also Like


More From This Category